Current Projects

Current Projects

There are several major capital projects in the works now or slated for the near future. 


Alexander High School (AHS) Performing Arts Auditorium

Alexander High School will soon have a state-of-the-art performing arts center, featuring seating for 600, an orchestra pit, a lobby large enough for intimate performances and gatherings, and gallery space to showcase student artwork.

The new performing arts center will include workshop space for building sets, storage so that sets can be saved and reused, dressing rooms, a green room, laundry room, concession stand and loading dock.

In addition to musical and dramatic performances, the theater will also used for grade level meetings and academic presentations. 
The project is expected to be completed by the beginning of the 2022-2023 school year.
AHS PAC sketch             


Douglas County School System (DCSS) Multi-Purpose Arena


After the school system Central Office moves into the former GreyStone Power Corporation building on Veterans Memorial Highway, the current Central Office building on Highway 5 will be razed and a new multi-purpose arena will be built that will house graduation ceremonies and other events. Central Office is expected to move to its new location during spring and summer 2021.


DCSS Old BOE
Old DCSS BOE














Lithia Springs High School (LSHS) Theater renovation


Work has not yet begun for the AHS auditorium and LSHS theater renovation, but projected completion dates are 2022.


Website by SchoolMessenger Presence. © 2022 Intrado Corporation. All rights reserved.